IJSER Home >> Journal >> IJSER
International Journal of Scientific and Engineering Research
ISSN Online 2229-5518
ISSN Print: 2229-5518 10    
Website: http://www.ijser.org
scirp IJSER >> Volume 3,Issue 10,October 2012
Fuzzy Programming Approach For A Compromise Allocation Of Repairable Components
Full Text(PDF, )  PP.142-147  
Author(s)
Irfan Ali and S. Suhaib Hasan
KEYWORDS
s: Reliability, Fuzzy Programming, Compromise allocation, Selective Maintenance, Multi-objective programming.
ABSTRACT
The present paper, considered the allocation problem of repairable components for a parallel-series system as a multi-objective optimization problem for two different models. In the first model, the reliability of subsystems are considered as different ob
References
[1] Ali, I., Raghav, Y. S., and Bari, A., (2011); Allocating Repairable and Replaceable Components for a System availability using Selective Maintenance: An Integer Solution; Safety and Reliability society, 31(2), 9-18.

[2] Ali, I., Khan, M. F., Raghav, Y.S., and Bari, A., (2011). Allocating Repairable and Replaceable Components for a System Availability using Selective Maintenance with probabilistic constraints; American Journal of Operations Research, 1(3):147-154.

[3] Ali, I., Raghav, Y.S., and Bari, A., (2011c); Integer goal programming approach for finding a compromise allocation of repairable components, International Journal of Engineering Science and Technology, 3(6): 184-195.

[4] Dhingra, A.K. (1992); Optimal apportionment of reliability and redundancy in series systems under multiple objectives, IEEE Trans. Rel., 41, 576-582.

[5] Huang, H.Z. (1997); Fuzzy multi-objective optimization decision-making of reliability of series system, Microelectronics Reliability, 37 (3), 447–449.

[6] Khan, M. F. and Ali, I. (2012); Allocation Problem of Repairable and Replaceable Components for a System Reliability using Selective Maintenance: An Integer Solution, International Journal of Scientific and Engineering Research, 3(5), 1-4.

[7] LINGO User’s Guide (2001), published by Lindo Systems Inc., 1415 North Dayton Street, Chicago, Illinois-60622 (USA).

[8] Mahapatra, D. R., Roy, S. K. and Biswal, M. P. (2010); Stochastic Based on Multi-Objective Transportation Problems Involving Normal Randomness, Advance Modeling and Optimization, 12 (2), 205-223.

[9] Mahapatra, G. S. and Roy, T. K. (2006); Fuzzy MultiObjective Mathematical Programming on Reliability Optimization Model, Applied Mathematics and Computation, 174 (1), 643-659.

[10] Park, K. S. (1987); Fuzzy apportionment of system reliability, IEEE Transactions on Reliability, R-36, 129-132.

[11] Rice, W.F., Cassady, C.R., and Nachlas, J.A., (1998); Optimal Maintenance Plans under Limited Maintenance Time, Industrial Engineering Research 98 Conference proceedings.

[12] Rao, S. S. and Dhingra, A. K. (1992); Reliability and redundancy apportionment using crisp and fuzzy multiobjective Optimization approaches, Reliability Eng. Syst. Safety, 37, 253-261.

Untitled Page