Economic and Reliability Analysis of a Centrifuge System with Rest period, Neglected Faults and Stoppage on Minor Faults
Full Text(PDF, )  PP.906-9I0  
Author(s)
Rajeev Kumar and Pooja Bhatia
KEYWORDS
centrifuge system, mean time to system failure, neglected faults, Markov process, profit, regenerative point technique
ABSTRACT
The paper deals with a model developed for a single centrifuge system working in Thermal Power Plant, Panipat (Haryana) India, which has alternate periods of operation and rest. The system may have minor, neglected and major faults. It is assumed that the occurrence of a minor fault leads to degradation of the system whereas occurrence of a major fault leads to failure of the system. The neglected faults that are in the system are generally neglected for repair during operation of the system until the system goes to rest or complete failure and the system has to be stopped on occurrence of minor fault for repair. Various measures of system effectiveness are obtained regarding the reliability and cost analysis of the system is carried out and the conclusions on the basis of the graphical studies are given. 
References
[1] Goel, L.R., Sharma, G. and Gupta, R., “Reliability analysis of a system with prevention maintenance and two types of repairing,” Microelectronics Reliability, 26, pp. 429-433 1986.

[2] Gopalan, M.N. and Murlidhar, N. N.,”Cost analysis of a one unit repairable system subject to on-line prevention maintenance and/or repair,” Microelectronics Reliability, 31(2/3), pp.233-228 1991.

[3] Goyal, A., Taneja, G. and Singh, D.V., “Reliability modeling and analysis of a sulphated juice pump system comprising three identical units with two types of working capacity and rest period,” Pure and Applied Mathematical Sciences, 71(1-2), pp.133-143 2010.

[4] Gupta, M.L. and Kumar, A., “On profit consideration of a maintenance system with minor repair,” Microelectronics Reliability, 23, pp.437-439 1983.

[5] Kumar, R. and Bhatia, P. “Availability analysis of a reliability model on a centrifuge system with rest period, neglected faults and stoppage on minor faults,” Proceedings of international conference on advances in modeling, optimization and computing 2011.

[6] Kumar, R. and Bhatia, P., “Reliability and availability analysis of a single unit centrifuge system considering various faults,” International conference on science and engineering (ICSE11), pp.536-539 2011.

[7] Murari, K. and Goyal, V.,” Reliability system with two types of repair facilities,” Microelectronics Reliability, 23(6), pp.1015-1025 1983.

[8] R.C. Garg and A. Kumar, “A complex system with two types of failure and repair”, IEEE Trans. Reliability., 26, pp.299-300,1977.

[9] Taneja, G., Tayagi, V. K. and Bhardwaj, P.,” Profit analysis of a single unit programmable logic controller,” Pure and Applied Mathematical Sciences, LX(1-2), pp.55-71,2004.