IJSER Home >> Journal >> IJSER
International Journal of Scientific and Engineering Research
ISSN Online 2229-5518
ISSN Print: 2229-5518 11    
Website: http://www.ijser.org
scirp IJSER >> Volume 2, Issue 11, November 2011
Reengineering of Data Warehouse of Public Sector
Full Text(PDF, 3000)  PP.  
Author(s)
Ashok Kumar, Anil Kumar
KEYWORDS
Data warehouse, data model, process model, legacy system
ABSTRACT
Data warehouse is a process of evolution and is a silver bullet of any one sector either public sector or private sector. As is universal truth, after specific time period database of these sector degrade its performance due to several reason, therefore reengineering of data warehouse is needed to increases the performance of data warehouse and reduces the risk associated with the modification of application
References
[1] W.H. Inmon, Building the data warehouse. QED. Press/ John wiley, 1992

[2] R. Kimball. The data warehouse toolkit, John Wiley & Sons, 1996

[3] Pinto, K., 2002, Project Management, Research - Technology Management, Industrial Research Institute, Inc.

[4] Adelman, S. Moss, L., 2004, Data Warehouse Risks, Sid Adelman & Associates, Sherman Oaks, CA, http://www.sidadelman.com/3_data_warehouse_risks.htm [Accessed on 04 April 2009]

[5] McBride, S., 2004, Poor project management leads to high failure rate, Available from: http://www.itworld.com/041015poor [Accessed on 10 Sep 2009]

[6] Corporate Executive Board, 2003. Best practices in warehouse management system implementation. Washington: Executive board

[7] Jourdan, Z., Rainer, R., and Marshall, T., 2008. Business Intelligence: An Analysis of the Literature, Information Systems Management, 25(2), pp.121-131

[8] Syed Aris, S., Arshad, N., Mohamed, A., 2008, Risk Management Practices in IT Outsourcing Projects, Universiti Teknologi MARA Selangor, MALAYSIA, 1-3

[9] Celar, S., 2005, Project Management in IT – Projects – A Framework for the risk management approach in SW Maintenance, Annals of DAAAM for 2005 & proceedings of the 16th International DAAAM Symposium, Vienna

[10] Project Management Institute, Inc., 2004, Guide to the Project Management Body of Knowledge - PMBOK Guide, 3rd ed, Pennsylvania

[11] Smith, G & Merritt, M., 2002, Proactive Risk Management: Controlling Uncertainty in Product Development, New York: Productivity Press

[12] Visser, K., Viviers, J., 2008, A risk management methodology for nonMetallic process equipment, South African Journal of Industrial Engineering, Vol 19, Issue 2, Southern African Institute for Industrial Engineering

[13] ""Conversion Technology: An Assessment,"" Data Base,vol. 12&13, no. 411. Surer-Fall, 1981, pp. 39-61.

[14] Ambriola, V., R. Conradi and A. Fuggetta, Assessing process-centered software engineering environments, ACM Trans. Softw. Eng. Methodol. 6, 3, 283-328, 1997.

[15] D.G. Rice and S. Laufer, ""Putting Top-Down and Bottom-Up Analysis Together,"" Database Programming & Design vol. 1. no. 12, December 1988, pp. 46-53.

[16] E. Yu and J. Mylopoulos, “Understanding „Why‟ in Software Process Modeling, Analysis, and Design,” Proc. 16th Int‟l Conj SOBware Engineering, IEEE CS Press, Los Alamitos, Calif., 1994, pp. 159-168.

Untitled Page