A simple approach to fuzzy critical path analysis in project networks
Full Text(PDF, 3000)  PP.  
Author(s)
Shakeela Sathish, K. Ganesan
KEYWORDS
Trapezoidal fuzzy numbers, Fuzzy arithmetic, Ranking, Project network, Critical path, Floats, Eearliest start, Eearliest finish, Latest start, Latest finish.
ABSTRACT
In this paper, we propose a new approach to critical path analysis in a project network whose activity times are uncertain. The uncertain parameters in the project network are represented by fuzzy numbers. We use fuzzy arithmetic and a fuzzy ranking method to determine the fuzzy critical path of the project network without converting the fuzzy activity times to classical numbers. The proposed method is compared with the existing method using examples.
References
[1] S. Chanas, P. Zielinski, Critical path analysis in the network with fuzzy task times, Fuzzy sets and systems, 122 (2001) 195-204.

[2] S.M. Chen and T.H. Chang, Finding Multiple Possible Critical Paths using Fuzzy PERT, IEEE Transactions on systems, man and cybernetics - PartA: systems and humans, Vol. 31, No.6., 2001.

[3] S.M. Chen, Fuzzy system reliability analysis using fuzzy number arithmetic operations, Fuzzy sets and systems, 64 (1994) 31-38.

[4] C.T. Chen and S.F. Huang, Applying fuzzy method for measuring criticality in project network, Information sciences, 177 (2007) 2448-2458.

[5] D. Dubois and H. Prade, Possibility Theory: An Approach to Computerized Processing of Uncertainty, New York: Plenum, 1988.

[6] D.Dubois, H. Fargier, V.Galvagonon, On latest starting times and floats in task networks with ill-known durations, European Journal of Operational Research 147 (2003) 266-280.

[7] M. Hapke and R. Slowinski, Fuzzy priority heuristics for project scheduling, Fuzzy sets and systems, 83(3) (1996) 291-299.

[8] G.J. Klir, B.Yuan, Fuzzy Sets and Fuzzy Logic: Theory and Applications, Prentice- Hall, International Inc., 1995.

[9] D.L. Mon, C.H. Cheng, and H.C.Lu, “Application of fuzzy distribution on project management,” Fuzzy sets and systems, vol.73, no.3, pp.227-234, 1995.

[10] N. Ravi Shankar,V. Sireesha, P. Phani Booshan Rao, An analytical method for finding critical path in a fuzzy project network, Int.J.Contemp.Math.Sciences, 5(20) (2010) 953-962.

[11] S. Yao and F.T. Lin, Fuzzy Critical Path Method Based on Signed Distance ranking of fuzzy numbers, IEEE Transactions on systems, man and cybernetics-Part A: systems and humans, 30 (1) 2000.

[12] Zadeh, Fuzzy sets, Information and Control, 8 (1965) 338-353.

Untitled Page