Water Resources Management: Case Study of El Minia Governorate, Egypt [ ]


Ministry of water resources and irrigation in Egypt is currently implementing projects that expand new cultivated area, as a consequence the supplies of Nile River to the existing lands will be affected. Because Egypt is an arid country with hardly any rainfall, water shortage is a major problem facing any development in Egypt, so water management is of paramount importance. The present paper aims to investigate the various options for the water resources management in El Minia governorate, one of the major provinces in Egypt. A complete map of the water resources has been prepared including irrigation and drainage processes. In addition, the political needs for distribution, management and control of the water resources have been taken into consideration. The main features of one of the famous commercially available unsteady simulation software package, the Operational Planning Distribution Model (OPDM), has been described and used to simulate water distribution system and crop yield. It has been also implemented to the selected case study to develop appropriate water plan. As the weather condition is an important factor that affects crops consumptive use of water, the monthly rate of sunlight hours, rainfall, wind speed, evaporation and relative humidity have been considered during the study period. Furthermore, the impact for allocation of the irrigation water has been investigated. Moreover, the different options have been compared from technical and economical points of view. Finally, effect of variation in both surface and groundwater quantities and qualities on the gross revenue has been presented.