Minimization of Power Loss in Distribution Networks by Different Techniques Mr.Rudresh.B.Magadum, Mr.Tejaswi.M.Timsani

AbstractThis paper proposes accurate loss minimization is the critical component for efficient electrical distribution power flow. The contribution of this work presents loss minimization in power distribution system through network reconfiguration, DTC relocation, voltage re gulator placement, express feeders and building new substation.

Index TermsDistribution system, Network Reconfiguration, Express Feeder, Automatic Voltage Regulator (AVR) placement,

—————————— ——————————
energy theft are included in the total, losses go as high as 65%
in some states and average about 35- 40%. The financial loss

1. INTRODUCTION

he distribution system is the most visible part of the supply chain, and as such the most exposed to the critical observation of its users. It is, in many cases, the

has been estimate at 1.5% of the national GDP.

TABLE.1 COMPARISON OF LOSSES IN DIFFERENT

STATES OF INDIA [2]

largest investment, maintenance and operation expense, and
the object of interest to government, financial agencies, and associations of concerned citizens. About 30 to 40 % of total investments in the electrical sector go to distribution systems [3], but nevertheless, they have not received the technological impact in the same manner as the generation and transmission systems.
Ideally, losses in an electric system should be around 3 to 6%. In developed countries, it is not greater than 10%.However, in developing countries, the percentage of active power losses is around 20%; therefore, utilities in the electric sector are currently interested in reducing it in order to be more competitive, since the electricity prices in deregulated markets are related to the system losses. In India, collective of all states, in 2008 the technical and non technical losses are accounted as 23% of the total input energy [2]. To manage a loss reduction program in a distribution system it is necessary to use effective and efficient computational tools that allow quantifying the loss in each different network element for system losses reduction. Various authors have discussed loss
minimization in different aspects.
India’s transmission and distribution losses are among the
highest in the world. When non-technical losses such as

2. LOSS REDUCTION AND VOLTAGE IMPROVEMENT TECHNIQUES.

Technical losses can be reduced by up-gradation of the existing network using.

IJSER © 2012

 Network reconfiguration
 DTC relocation (Change of feed)
http://www.ijser.org

The research paper published by IJSER journal is about Minimization of Power Loss in Distribution Networks by Different Techniques 2

ISSN 2229-5518

 Network re-conduct ring
 Voltage regulator placement
 Use of express feeder
 Adoption of High voltage distribution system (HVDS)
 Building new substation

2.1 Network Reconfiguration


Optimal distribution planning involves network reconfiguration for distribution loss minimization, load balancing under normal operating conditions and fast service restoration minimizing the zones without power under failure conditions. Network Reconfiguration is the process of operating switches to change the circuit topology so that operating costs are reduced while satisfying the specified constraints.

Fig.1 Simple example for network reconfiguration

2.2 Distribution Transformer (DTC) Relocation

DTC relocation involves the change of feed point. This scheme is adopted as an immediate solution. The new point
of connection can be determined by feasibility study.
2. Investment required is less

Demerits

1. The extent of voltage improvement is limited
2. For further improvement of voltage profile we have to adopt for other methodologies which involves extra investment.

2.3 Network Re-conductoring

Replacement of the existing conductor on the feeder with an optimal conductor size for optimal length of the feeder since, size of the conductor is the parameter that decides current density and resistance. This scheme is applied when Network reconfiguration is not possible
The existing conductor is no more optimal due to rapid load growth Re-conductoring depends on Load expected to serve and capacity required in future.
Merits
1. Increases the capability to handle load growth

Demerits

1. Additional investment is required

2.4 Voltage Regulator Placement

The capability of a voltage regulator to maintain smooth voltages is an attractive solution. The optimal location of the placement can be determined by conducting feasibility study. Merits
1. Smooth variation of voltage is possible.

Demerits

1. The extent of voltage improvement is limited
2. Extensive use will further deteriorate the network.

2.5 Use of Express Feeder

Express feeder is the feeder running from the source to any load point with no tapping intermediately. The use of express feeder is recommended when Reconfiguration or Re- conductoring is not possible. The point of connection depends upon the quotient of voltage difference.

Merits

1. More effective in improving the voltage profile
2. Supports more load growth compared to reconfiguration and re-conductoring schemes
3. Further reconfiguration is made possible

Demerits

1. Additional investment is required

Merits

1. Supports further reconfiguration

2.6 Adoption of High voltage distribution

IJSER © 2012

http://www.ijser.org

The research paper published by IJSER journal is about Minimization of Power Loss in Distribution Networks by Different Techniques 3

ISSN 2229-5518

System (HVDS)

Conversion of existing LVDS to HVDS reduces the technical losses effectively
Example: For a 100 KVA load the current for 11kV system
is 5.2 A whereas for 415 V it is 140 A. Merits
1. Reduced losses and improved voltage profile

Demerits

1. Additional investment is required
2. Regular maintenance is required

2.7. Building new substation

This involves addition of new substation in addition to the existing. Location of the installation is determined by feasibility study. This scheme has to be adopted as the last option.

Merits

1. More reliable
2. Reduction in losses and improved voltage profile

Demerits

1. Additional investment for building new substation

3. ORDER OF PRECEDENCE FOR ADOPTION OF METHODOLOGIES


Network reconfiguration
DTC relocation (Change of feed) Line re-conductoring
Voltage regulator placement
Use of express feeder
Adoption of HVDS
Building new substation Fig.2 Single line diagram of 415 volt distribution centre drawn in

MiPower software package

4. SIMULATION RESULTS OBTAINED FROM MIPOWER SOFTWARE PACKAGE.

MiPower is a highly interactive, user-friendly windows based Power System Analysis package. It includes a set of modules for performing a wide range of power system design and analysis study. MiPower features include Windows GUI with centralized database. Steady state, transient and electro- magnetic transient analysis can be performed with more accuracy and tolerance.

TABLE.2 SIMULATION RESULTS

IJSER © 2012

http://www.ijser.org

The research paper published by IJSER journal is about Minimization of Power Loss in Distribution Networks by Different Techniques 4

ISSN 2229-5518

Topology

Loss(in kw)

Original

58.9786

Network reconfigration

34.3152

DTC Relocation

30.3047

Network reconductoring

21.0285

Expree feeder

19.5944

HVDS

15.8442

Applying cost benefit analysis considering MiPower software package the network reconfiguration no additional investments are required hence it is considered feasible. The building of new substation is carried out only in unavoidable situations where no further augmentation is possible. So, four topologies DTC relocation, network re-conductoring, Express feeder and HVDS are considered. A cost benefit is analysis is performed for the fore-mentioned topologies and the results are furnished the necessary inputs required are listed and are taken as specified.

TABLE.3 OTHER INVESTMENTS PARAMETER CONSIDERED.

Input

Value considered

Interest

12 %

O & M charges

3 %

Project life

20 years

Unit charges

Rs. 2.5/-

Load factor

0.6

Constant A (for computing LLF)

0.3

TABLE.4 OTHER INPUTS TAKEN FOR COST BENEFIT ANALYSIS

5. RESULTS OBTAINED FROM COST BENEFIT ANALYSIS

The Benefit to Investment ratio and payback periods of the projects considered are as tabulated below.
Table.5 cost benefit analysis results

IJSER © 2012

http://www.ijser.org

The research paper published by IJSER journal is about Minimization of Power Loss in Distribution Networks by Different Techniques 5

ISSN 2229-5518

6. CONCLUSION

In this paper, the cost benefit calculation is done using MiPower software results. From cost benefit calculation it is clear that DTC relocation having benefit to investment ratio
20.038, it clears that the DTC relocation having less payback period hence which helps in distribution loss reduction in very easy way.

7. REFERENCES

[1]. P. V. V. Rama Rao and S. Sivanagaraju, ―Radial Distribution Network Reconfiguration for Loss Reduction and Load Balancing using Plant Growth Simulation Algorithm‖ International Journal on Electrical Engineering and Informatics - Volume 2, Number 4, 2010

[2]. L.Ramesh, S.P.Chowdhury, S.Chowdhury, A .A. Natarajan,

C.T.Gaunt,‖Minimization of Power Loss In Distribution Networks by Different methods‖, International Journal of Electrical and Electronics Engineering 3:9 2009.

[3]. S. A. Qureshi and F. Mahmood , ―Evaluation by

Implementation of Distribution System Planning for Energy Loss

Reduction‖ Pak. J. Engg. & Appl. Sci. Vol. 4, Jan 2009 (p. 43 -55)

[4]. F. V. Gomes, S. Carneiro, J. L. R. Pereira, M. P. Vinagre, P. A. N. Garcia, and L. R.Araujo, ―A new distribution system reconfiguration approach using optimum power flow.And sensitivity analysis for loss reduction,‖ IEEE Trans. Power Syst., vol. 21, no. 4, pp.1616–1623, Nov.

2006.

[5]. S. Sivanagaraju, et.al, ―An Efficient Genetic Algorithm for Loss Minimum DistributionSystem Reconfiguration‖, International Journal of Electrical Power Components and Systems, Vol.34, No.3, March 2006, pp.249-258.

[6]. Prabha kundur, Power system stability and control McGraw

Hill,Inc

currently pursuing M.Tech Degree in Power and Energy Systems in Electrical and Electronics Engineering, Basaveshwar Engineering College, Bagalkot, India. His areas of interest are Distribution Generation, Renewable energy, FACTS.

BIOGRAPHY

Rudresh.B.Magadum was born in Karnataka, India on 09 July 1987. He obtained B.E (Electrical and Electronics) from Vishveswaraya Technological University, Belgaum, and Karnataka, India. He is currently pursuing M.Tech Degree in Power and Energy Systems in Electrical and Electronics Engineering, Basaveshwar Engineering College, Bagalkot, India.

Tejaswi.M.Timsani was born in Karnataka, India on 14 April 1986. He obtained B.E (Electrical and Electronics) from Vishveswaraya Technological University, Belgaum, and Karnataka, India. He is