Abstract— In this paper a comprehensive model for Distribution Systems Planning (DSP) in the case of using Distributed Generation (DG), with regard to load models is provided. Proposed model optimizes size and location of the distributed generation. This model can optimize investment cost in distributed generation better than other solutions. It minimizes the operating costs and total cost of the system losses. This Model affects the optimum location and size of the distributed generation in distribution systems significantly. Simulation studies based on a new multiobjective evolutionary algorithm is achieved. It is important that in the analysis made in this paper, DG is introduced as a key element in solving the DSP. Moreover, the proposed method easily and with little development can satisfy the other goals.

Index Terms— Economic Analysis, Distributed Generation, Distribution Systems Planning, Load Models.

—————————— • ——————————

1 INTRODUCTION

istribution Companies (DISCOs) should apply new strategies in order to increase economic power gen- eration (because of load growth) and giving services
to customers and not being remained behind in market competition of electrical power. By using of new alterna- tives, these goals are available for solution of planning problem of distribution system in addition to traditional ones.
The load growth value is predicted in traditional op- tions so that it may reach to a certain level. Then, a new capacity shall be added to the given system. By consider- ing new electrical substations or via expanding the capac- ity of the existing substations through new feeder, such a new capacity will be obtained by both of them [1], [2]. One of the new options to planning for increase in capaci- ty is Distributed Generation. DG may lower total costs in the system, decrease load flow within system, and im- prove voltage profile [3], [4], and leading to decreased system losses [3]-[5], relieving the heavy loaded feeders and increase lifetime of equipments [6].
From [7]-[10], a perfect revision is carried out on load models which are applicable to load flow and dynamic studies. Such studies are conducted on frequency or vol- tage dependent load models.
During recent years, the studies on evolutionary algo- rithms have shown that these methods have not many of previous problems [11]. In general, these methods may obtain multiple pareto optimal solutions in one single run.
This paper suggests using of DG by DISCOs, as a new economic tool for Distribution System Planning (DSP) Problem. The proposed approach makes decision on DG optimal location and size and the optimized power which should inject through distribution system. The derived
Similarly, in this paper, the effect of load models on DG location and size planning optimization has been argued. We will see that load models considerably affect on plan- ning for location and size of DG within distribution net- works. Also, an approach is given to solve the problem which is based on Strength Pareto Evolutionary Algorithm (SPEA).

2 DISTRIBUTION SYSTEM PLANNING MODEL

In the case of load growth in power electricity market, DISCO has two options to meet such demand.

1- Scenario A: Purchasing the required extra power from main grid and extending the existing substations in distribution network. At this scenario, DISCO has to develop the existing substations by installation of new transformers and upgrading some existing feeders’ capacities if they have not sufficient thermal capacity, and purchasing power from the main grid.

2- Scenario B: Investment on DG as an alternative candidate option for solving the DSP problem and purchase power from main grid and extending of the existing substation.

A. Model Formulation

This paper aims to minimize the investment and operating costs of DG, reduction of active and reactive losses, improvement in voltage profile and relieving the heavy loaded feeders. It also conducts study about impact of voltage dependent load models, namely, residential, industrial and commercial load models within different scenarios of planning. Load models are defined as follows.
results from this model may be used for bill estimation of customers of Distribution Company. Two comprehensive scenarios will be discussed to cover various probabilities.

a

Pi = P0i Vi

fJ

/ Qi = Q0i Vi

(1)

IJSER © 2011 http://www.ijser.org

International Journal of Scientific & Engineering Research Volume 2, Issue 4, April-2011 2

ISSN 2229-5518

where Pi and Qi are active and reactive power at bus i, P0i M T M
and Q0i are active and reactive power operating point in

J = C i (S Max + BK )+ 8760 t Cri S DGi

bus I, Vi is voltage in bus i and a and p are active and reactive power exponents. In a constant power model

i=1

f DGi

T TN M

t =1 i=1

2

(5)

conventionally used in power flow studied a = p = 0 is

+ 8760 t ij

pf .Ce

+ A + B

assumed. The values which are used for are active and
reactive power exponents in industrial, residential and commercial load models in this paper are given in Table 1

t =1

SS TU

i=1 j =1

TN M

Zij

[12].

A = Ci,u + Cij + 8760 t pf .Ce .Si,u (6)

TABLE 1

EXPONENT VALUES

i=1 u=1

i=1 j=1

t =1

i=1

TN M

T TU

B = Cij + 8760 t pf .Cint (Sint ).Sint (Sint ) (7)

During studying residential model, it is assumed that

i=1 j=1

t =1

t =

i=1

1

(1 + d )t

(8)

the system only has residential loads. Similarly, this is also applied for industrial and commercial loads where all these loads are of industrial and commercial types, respectively. In real situations, loads aren’t exactly residential, commercial and industrial, so the mixture load class should be foreseen for distribution system. There are several ideas to study on effect of DG within distribution systems. One of such ideas is the computation of multiple indices to describe the effects of disperse generations on distribution system. These indices are

1) Active and Reactive Power Loss Indices (ILP and ILQ):

where BK denotes backup capacity of DG (MVA), p is present worth factor, Cf as investment cost in distributed generations ($/MVA), Cr DG operating cost ($/MVA), Ce is Electricity market price ($/MWh), Cij is Total feeder cost from i to j ($), Ci,u as Potential transformer u in existing substation i cost ($), Cint Intertie electricity market price ($/MWh), D is total load demand (MVA), d discount rate, i and j are bus indices, J as cost index ($), M is total number of load buses, pf as system power factor, SDG is generation power of distributed generations (MVA), SDGMax denotes maximum capacity of distributed generations (MVA), Sij power flow in feeder connecting

[PLDG ]

[QLDG ]

bus i to j (MVA), Sij

Max is feeder thermal capacity between

ILP =

[PL ]

× 100 / ILQ =

[QL ]

× 100

(2)

i and j buses (MVA), Si,u is dispatched power of
transformer u in substation i (MVA), Sint as amount of power imported by the intertie (MVA), SSS is power
Where PLDG and QLDG are total loss of active and reactive
purchased by the distribution utility (MVA), SSS

ax is

power distribution system with DG, PL and QL are total loss of active and reactive power of total system without DG in the distribution network.

2) Voltage Profile Index (IVD): One of the advantage of

proper location and size of the DG is the improvement in voltage profile.

M

capacity of existing substation (MVA), SS as number of existing substations, t incremental time intervals (year), T horizon planning year (year), TN total number of system buses, TU total number of substation transformers, V bus voltage (V), Vn system nominal voltage (V), 11V maximum permissible voltage drop (V), and Zij feeder impedance




between buses i and j (QohmsQ) [13].

( V - V )

IVD = max n

1

i X 100

(3)

Optimization should be minimized by consideration of

i=2

\ 1 )

3) MVA Capacity Index (IC): This informational index gives information in the field of system necessities for promoting transmission line.

various operational constraints. Such constraints are given in (9) – (14).

1) Total Power Conservation: By considering losses of lines and power which is generated by DG (if it exists), sum of input and output powers should be equal to existing total load demand.


( S )

n ij

TN ,1V 2 M

IC = maxi=2 CS

\

ij )

(4)

1

ij -

1

ij 1

Z 1

S ji

+ S DGj

= D j , \7j E M

(9)

4) Cost Index M$ (J):

i=1

ij i=1

IJSER © 2011 http://www.ijser.org

International Journal of Scientific & Engineering Research Volume 2, Issue 4, April-2011 3

ISSN 2229-5518

2) Distribution Feeder’s Thermal Capacity: Distribution system’s feeders have a capacity limit for the total power flow through it.

Two three phase transformers with 10 MVA power ca- pacity and 0.2 M$ price for each one may be also installed to expand the main substation. The cost of upgrading the existing primary distribution feeder with another of high-

Sij

S Max , \7i ETN , \7j E M

(10)

er capacity is 0.15 M$/Km. The price of other existing equipments and feeders will be considered zero. System power factor and discount rate are also 0.9 and 12.5%,

3) Distribution Substation’s Capacity: Power which is

generated by substations shall be at the substations capacity level.

M

respectively. During all optimization runs, population size and generations maximum number are 300 and 750 respectively. The maximum size of Pareto’s optimal set includes 20 solutions. The probabilities of crossover and mutation are 0.9 and 0.01, respectively. Recently, the stu-

j =1

SSSij

S Max , \7i E SS , \7j E M

(11)

dies on evolutionary algorithms have indicated that these algorithms may be effective in removal of problems of

4) Voltage Drop: The DISCO provides the predetermined maximum permissible voltage drop limit.

older methods. The applied optimization algorithm is
SPEA [14].

0 Vi - V j ,1V , i ETN , j E M

(12)

3 ANALYSIS AND RESULTS

Two argued main scenarios in this paper are simulated in

5) DG Operation: The generated power by DG shall be

lesser than DG capacity.
order to evaluate preference of investing on DGs in solving DSP problems in comparison with other traditional planning options.

S DGi

S Max , \7i E M

(13)

3.1 Scenario A

6) Intertie’s Delivery Power Capacity Limit: DISCO determines the intertie’s delivery power cost rates. Rate of delivered power depends on the purchased power value by distribution network.

Cint (Sint ) = 1.00Ce , \7Sint E{0,5MVA}

= 1.05Ce , \7Sint E {5,10MVA}

In this scenario, DG size is zero. This model gives the optimal cost of substation’s new transformers, and the power which is dispatched by these transformers, and the amount of delivered power from main grid to distribution network for all types of load models (NL is number of lines upgrading).
Results which obtained from optimization model are

= 1.15Ce , \7Sint E {10,15MVA}

= 1.35Ce , \7Sint E {15,20MVA}

B. Primary Distribution System under Study

(14)

given in Table 2 for all load models. It is seen that load
models affect on solutions. It is possible that the obtained solution does not apply to industrial load by using of constant load model. Such an impact from load models is also observed for residential, commercial, and composed models. More money should be spent by purchase of new
The existing primary distribution system under this
study is a 9-bus system [13]. This system has a 40MVA substation. Load growth which has been predicted for 4 years is approximately 28% (51.1 MVA). The given system has 4 feeders with thermal capacity of 12 MVA.
Based on market indexes in 2002 (in USD), 70 $/MWh and 0.5 M$/MVA have been considered as prices of electricity market and natural gas generator set, respectively. DGs have a capacity which is multiples of 1
MVA at a generated electricity price of 50 $/MWh. An extra DG with 1 MVA capacity has been allocated for each DG as backup [13]. It is assumed that DG has unity power factor [12]. The maximum capacity of DG has been provided for each bus (maximally 4 units plus one unit as backup). This is done in order to keep distributed generation concept and DG not to be concentrated as a centralized plant so the existing main substation to be used at maximum level.
equipments and due to compensation for losses so these costs are added to customers’ bills.

3.2 Scenario B

Table 3 indicates the solutions that are derived for investment on DG option. Comparing these results with the results of above scenario, we can see that investment on DG presents a better planning. For constant load model, four groups of DG with capacities of 4, 4, 3 and 2
MVA and 1 MVA have been selected as backup in buses
7, 9, 3 and 9 in addition a single transaction taking place by the intertie of 1.4927 MVA and the dispatched power by expanding substation is zero (we do not expand the substation). Cost of planning for this load model is 2% at this scenario, active losses 52%, and the reactive losses is
52% lesser than at first scenario. It is clear that by investing on DGs instead of purchase of power at higher

IJSER © 2011 http://www.ijser.org

International Journal of Scientific & Engineering Research Volume 2, Issue 4, April-2011 4

ISSN 2229-5518


prices, DISCO may reduce its consumers’ bill due to decrease in cost. Table 3 shows detailed results which are obtained for other load models in Scenario B.
DG, as a key element in DSP problem, is not used only to minimize planning cost and reduced active and reactive losses, but as it discussed, it also has several economic, social and electrical advantages. Figures (1) – (5) show voltage profiles of distribution network buses for all load models in both manners.

TABLE 2

RESULTS OF SCENARIO A

TABLE 3

RESULTS OF SCENARIO B

Voltage profiles are very better for all load models in planning with DG than without it. Load models influence on solutions.
One of the other advantages of introducing DG to solve DSP problem has been shown in Figs (6) – (10). As it seen, feeders’ power flow is decreased for all load models, as a result, system losses is reduced and at last, losses cost will be decreased. Also, this reduces the feeders’ load and subsequently, it increases feeders’ lifetime. Similarly, we have a chance to use the existing distribution network with no need to upgrading feeders for further load growth. It is again observed that load models influence on solutions. The solutions which are derived from different load models do not apply to other models.

Fig. 1. DISCO’s buses voltage profile for constant load model

Fig. 2. DISCO’s buses voltage profile for industrial load model

Fig. 3. DISCO’s buses voltage profile for residential load model

IJSER © 2011 http://www.ijser.org

International Journal of Scientific & Engineering Research Volume 2, Issue 4, April-2011 5

ISSN 2229-5518

Fig. 4. DISCO’s buses voltage profile for commercial load model

Fig. 8. DISCO’s primary distribution feeder power flow for residential

load model

Fig. 5. DISCO’s buses voltage profile for mixture load model

Fig. 9. DISCO’s primary distribution feeder power flow for commercial load model

Fig. 6. DISCO’s primary distribution feeder power flow for constant load model

Fig. 7. DISCO’s primary distribution feeder power flow for industrial load model


they are highly different from each other in cost values, losses, voltage profile and feeders’ power flow, and this indicates that for an appropriate location-size planning, load models are important and crucial. As a new tool in solving DSP problem in comparison with traditional planning alternatives, investment on DGs may create further economic, social advantages. As a result, DISCO may restore its own customers and prevents these customers not to buy electricity power from other companies.

Fig. 10. DISCO’s primary distribution feeder power flow for mixture load model

IJSER © 2011 http://www.ijser.org

International Journal of Scientific & Engineering Research Volume 2, Issue 4, April-2011 6

ISSN 2229-5518

4 CONCLUSION

A comprehensive analysis was presented for DG location- size planning multiobjective optimization, including load models, in distribution systems. It was seen that when load models are considered, some changes occur in DG location and size. To estimate DGs optimal location and size, a new advanced optimization model was used. The proposed optimization model adapts cost, system total losses, voltage profiles and feeders’ power flow and gives optimal answer which varied upon change of load models. The output results of this model not only give DG location and size, but also express a need to cost in order to purchase other new equipments (transformers and feeders upgrading). Based on information and rates that used at this paper, we observed that DG may lower planning cost, improve voltage profile of distribution system, decrease feeders’ power flow of distribution networks, and minimize losses in distribution system and increase their lifetime by lower down feeders’ load. Thus, DG gives an opportunity to use the existing distribution network to further load growth with no need to upgrade feeders.

REFERENCES

[1] M. Ponnavaikko, K. S. Prakasa, and S. S. Venkata, “Distribution system planning through a quadratic mixed-integer program- ming approach,” IEEE Trans. Power Del., vol. PWRD-2, no. 4, pp. 1157–1163, Oct. 1987.

[2] S. K. Khator and L. C. Leung, “Power distribution planning: A review of models and issues,” IEEE Trans. Power Syst., vol. 12, no. 3, pp. 1151–1159, Aug. 1997.

[3] P. P. Barker and R.W. De Mello, “Determining the impact of

distributed generation on power systems. I. Radial distribution systems,” in IEEE Power Eng. Soc. Summer Meeting, vol. 3,

2000, pp. 1645–1656.

[4] X. Ding and A. A. Girgis, “Optimal load shedding strategy in power systems with distributed generation,” in IEEE Winter Meeting Power Eng. Soc., vol. 2, 2001, pp. 788–793.

[5] N. Hadjsaid, J. F. Canard, and F. Dumas, “Dispersed genera-

tion impact on distribution networks,” IEEE Comput. Appl. Power, vol. 12, no. 2, pp. 22–28, Apr. 1999.

[6] L. Coles and R.W. Beck, “Distributed generation can provide an

appropriate customer price response to help fix wholesale price volatility,” in IEEE Power Eng. Soc. Winter Meeting, vol. 1,

2001, pp. 141–143.

[7] C. Concordia and S. Ihara, “Load representation in power sys-

tems stability studies,” IEEE Trans. Power App. Syst., vol. PAS-

101, no. 4, Apr. 1982, pp. 969–977.

[8] IEEE Task Force on Load Representation for Dynamic Perfor-

mance, “Bibliography on load models for power flow and dy- namic performance simulation,” IEEE Trans. Power Syst., vol.

10, no. 1, Feb. 1995, pp. 523–538.

[9] IEEE Task Force on Load Representation for Dynamic Perfor-

mance, “Load representation for dynamic performance analy-

sis,” IEEE Trans. Power Syst., vol. 8, no. 2, May 1993, pp. 472–

482.

[10] IEEE Task Force on Load Representation for Dynamic Perfor- mance, “Standard load models for power flow and dynamic performance simulation,” IEEE Trans. Power System, vol. 10, no. 3, Aug. 1995, pp. 1302–1313.

[11] C. A. C. Coello, “A comprehensive survey of evolutionary based multiobjective optimization techniques,” Knowledge and Information Systems, vol. 1, no. 3, 1999, pp. 269–308.

[12] D. Singh, K. S. Verma, “Multiobjective Optimization for DG

Planning With Load Models,” IEEE Trans. Power Syst., vol. 24, no. 1, Feb. 2009, pp. 427-436.

[13] W.EI-Khattam, Y. G. Hegazy, M. M. A. Salama, “An Integrated

Distributed Generation Optimization Model for Distribution System Planning,” IEEE Trans. Power System, vol. 20, no. 2, May 2005, pp. 1158-1165.

[14] M. A. Abido, “Environmental/Economic Power Dispatch Using

Multiobjective Evolutionary Algorithms,” IEEE Trans. Power

Syst., vol. 18, no. 4, Nov.2003, pp. 1529–1537